![]() Alta Mesa's operations are located on private land, with 100% of minerals privately owned, and in a supportive jurisdiction with primary regulatory authority residing with the State of Texas.Advancing the Alta Mesa Processing Plant, in conjunction with planned production in 2023 at the Rosita Uranium Processing Plant, will cement enCore Energy's position as the early leader in In-Situ Recovery (ISR) uranium production in the US.The Alta Mesa Processing Plant can reach commercial production levels with limited required capital, from funds on hand, within an estimated 10 months of today's announced production decision.There are only 11 licensed and constructed uranium production facilities in all of the United States (US) The Alta Mesa Processing Plant is enCore's third fully licensed production facility, along with Rosita and Kingsville Dome, all located in the business-friendly state of Texas. ![]() Concurrently, enCore's technical staff are identifying equipment maintenance and limited repair needs at the Alta Mesa Processing Plant involving the ion exchange system, uranium precipitation, drying and packaging circuits in order to restart production after having been on standby since 2013.Īlta Mesa Processing Plant and Project highlights include: ![]() Development drilling, production and injection well installation will start this month. ![]() Work underway at the Alta Mesa Processing Plant includes the construction of equipment staging areas and drill pads in the fully permitted Production Authorization Area (PAA), planned for initial production due to its proximal location adjacent to the Plant. Copper Prices Could See "Astronomical Rise" as Supply Concerns Increase.10 Largest Producers of Gold by Country. ![]()
0 Comments
Leave a Reply. |